We started on the outside,
to keep out the elements.
This has been a problem since the '20s. 
 
And, Now the Roofs are Finished:
The first part of the remodel of WPPC is done.
 The roofs have been replaced/reworked.
(More pictures on the The Roof Project via links below)
     
Before:                                             After:
                 
The old glass skylights were replaced with modern 
polycarbonate skylights. Much brighter and safer.
 
Before:                                             After:

           

The   difference between the old roof and the new roof.
What a difference!
And the roofs are now insulated.
The old roof (over the Upper Room and the Old Sanctuary)
had insulation blown in the crawl space.
And the new roof (over the New Sanctuary) had 6 inch thick panels installed over the old roof.
 
 
 
 
Meet the Roofing Construction Team!
(from left to right)
Jerry Brisbin (V.P. Operations - Crest NW),
Dave Patrick (President - Crest NW),
Joel (Sheetmetal),
Paul Hofseth (Superintendent - Crest NW),
Bryan Loberg (Senior Supervisor - Loberg Roofing)
and Dennis Chivers (Architect - BPH Architects )
   